Ropeways in Campo Blenio (Ticino, Switzerland)

AI Abstract

In Campo Blenio, up until today, 6 lifts have been built. Today, 3 ropeways are in operation. The lifts come in various forms, including Surface lift types. The facilities are located between 1230 and 1578 meters. The lengths range from 183 to 1226 meters. The lifts in Campo Blenio are part of the regional tourism infrastructure.