Ropeway Database - Projects

The following table provides an overview of projected ropeway installations in Germany and Switzerland for the next two years. The projects are listed in ascending order by year of construction and status. Where available, the current installation to be replaced by the planned new construction is also indicated.

The list is updated at irregular intervals. The information has been researched and prepared to the best of our knowledge. However, we cannot guarantee the accuracy of the data. Experience has shown that there are always changes in the planned implementation of projects at short notice.

ProjectManufacturerStatus
2025
80-LPB Stand-Kleintitlis 2
Engelberg (Titlis)
SteurerCompleted
35-LPB Grindelwald-Pfingstegg
Grindelwald (Pfingstegg)
GaraventaCompleted
100-LPB Birg-Schilthorn 1
Mürren (Schilthorn)
GaraventaCompleted
8-LPB Champsec-Sarreyer
Val de Bagnes
Von Rotz & WiedemarCompleted
10-KBK Duez-Le Bâté
Anzère (Pas de Maimbré)
GaraventaIn construction
10-KBK Segnes-Ils Cugns
Flims (Flims-Laax-Falera)
BartholetIn construction
8-LPB Furen-Trift
Grimsel
SteurerIn construction
8-KBK Fuorcla-Crap Masegn
Laax (Flims-Laax-Falera)
GaraventaIn construction
8-KBK Fuorcla-Vorabgletscher
Laax (Flims-Laax-Falera)
GaraventaIn construction
100-LPB Mürren-Birg 2
Mürren (Schilthorn)
GaraventaIn construction
15-KBK Weglosen-Sebli
Oberiberg (Hoch-Ybrig)
GaraventaIn construction
8-KBK Rivera-Piano di Mora
Rivera (Monte Tamaro)
BartholetIn construction
8-KBK Piano di Mora-Alpe Foppa
Rivera (Monte Tamaro)
BartholetIn construction
6-SBK/B Val Val-Cuolm Val
Sedrun (Oberalp)
GaraventaIn construction
6-SBK/B Val Val-Calmut
Sedrun (Oberalp)
GaraventaIn construction
6-SBK/B Randolins-Munt da San Murezzan
St. Moritz (Corviglia)
LeitnerIn construction
4-SBF Kleiner Almberg
Mitterfirmiansreut (Mitterdorf)
LeitnerIn construction
6-SBK/B Großer Almberg
Mitterfirmiansreut (Mitterdorf)
LeitnerIn construction
4-SBK/B Meierhofertälli-Wasserscheide
Davos (Parsenn)
GaraventaRealization definitive
2-SBF Mayens de Nax-Gautier
Nax
GaraventaRealization definitive
6-SBK Lac des Vaux-Col de Chassoure
Verbier (Les 4 Vallées)
BartholetRealization definitive
8-SBK/B Riffelberg-Gifthittli
Zermatt
LeitnerRealization definitive
8-SBK/B Hausberg-Kreuzwankl
Garmisch-Partenkirchen
DoppelmayrRealization definitive
6-SBK/B Pissevache-Grand Tsai
Bruson (Les 4 Vallées)
BartholetRealization probable
37-LPB Elsigbach-Elsigenalp
Frutigen (Elsigenalp)
GaraventaRealization probable
6-SBK / 10-KBK Planards-Savoleyres
Verbier (Les 4 Vallées)
GaraventaRealization probable
6-SKB/B Silbersattel
Steinach
DoppelmayrRealization probable
4-SBK Puozas-Parlets
Disentis
GaraventaRealization uncertain
8-LPB Verdasio-Rasa
Intragna
Inauen-SchättiRealization uncertain
6-SBK/B Wannenköpfle
Oberstdorf (Söllereck)
LeitnerRealization uncertain
2026
100-LPB Birg-Schilthorn 2
Mürren (Schilthorn)
GaraventaIn construction
10-KBK Innerarosa-Hörnli
Arosa (Lenzerheide-Arosa)
GaraventaRealization probable
6-SBK/B Schönboden-Hörnli
Arosa (Lenzerheide-Arosa)
GaraventaRealization probable
10-KBK Schifer-Weissfluhjoch
Davos (Parsenn)
GaraventaRealization probable
85-LPB Schwägalp-Säntis
Säntis
GaraventaRealization probable
10-KBK Verbier-Planards
Verbier (Les 4 Vallées)
GaraventaRealization probable
10-KBK Adelboden-Sillerenbühl
Adelboden (Hahnenmoos)
GaraventaRealization uncertain
10-KBK Fiesch-Bellwald
Bellwald
Realization uncertain
8-KBK Lana-La Meina
Evolène (La Meina)
Realization uncertain
80-LPB Fiescheralp-Eggishorn
Fiescheralp (Aletschregion)
GaraventaRealization uncertain
8-KBK Les Diablerets-Isenau
Les Diablerets (Isenau)
GaraventaRealization uncertain
10-KBK Laret-Muller
Samnaun
GaraventaRealization uncertain
10-KBK St. Moritz Bad-Signal
St. Moritz (Corviglia)
Realization uncertain

Legend

  • Completed: The construction of the installation is completed and the ropeway is in operation.
  • In construction: The installation is in the construction phase.
  • Realization definitive: The realization of the project is secured and the construction will start soon.
  • Realization probable: The realization of the project is officially confirmed and it is expected that objections, financing and other conditions for construction will be resolved shortly.
  • Realization uncertain: The realization of the project is officially planned. However, due to objections, financing problems, changed plans or other reasons, the construction may be delayed for some time or the project may be abandoned.