Ropeway Database - Projects
The following table provides an overview of projected ropeway installations in Germany and Switzerland for the next two years. The projects are listed in ascending order by year of construction and status. Where available, the current installation to be replaced by the planned new construction is also indicated.
The list is updated at irregular intervals. The information has been researched and prepared to the best of our knowledge. However, we cannot guarantee the accuracy of the data. Experience has shown that there are always changes in the planned implementation of projects at short notice.
Project | Type | Replaced installation | Manufacturer | Status |
---|---|---|---|---|
2024 | ||||
120-SPB Wabern-Gurten Köniz | Replacement ropeway | Garaventa | Completed | |
10-KBK Saas Fee-Hannig Saas Fee | Replacement ropeway | Completed | ||
1-SLE Trainerlift Jatzmeder Davos (Rinerhorn) | Replacement ropeway | Garaventa | In construction | |
80-LPB Stand-Kleintitlis 2 Engelberg (Titlis) | New ropeway | Steurer | In construction | |
10-KBK Startgels-Segnes Flims (Flims-Laax-Falera) | Replacement ropeway | Bartholet | In construction | |
10-KBK Segnes-Nagens Flims (Flims-Laax-Falera) | New ropeway | Bartholet | In construction | |
4-SBK/B Rungg-Stätzertäli Lenzerheide (Lenzerheide-Arosa) | Replacement ropeway | Leitner | In construction | |
8-KBK Les Marécottes-La Creusaz Les Marécottes | Replacement ropeway | Garaventa | In construction | |
85-LPB Stechelberg-Mürren Mürren (Schilthorn) | Replacement ropeway | Garaventa | In construction | |
6-SBK / 10-KBK Prarion-Tracouet Nendaz (Les 4 Vallées) | Replacement ropeway | Garaventa | In construction | |
10-KBK Ochsenkopf Süd Warmensteinach (Ochsenkopf) | Replacement ropeway | Previous installation | Leitner | In construction |
2025 | ||||
10-KBK Segnes-Ils Cugns Flims (Flims-Laax-Falera) | New ropeway | Bartholet | In construction | |
100-LPB Mürren-Birg Mürren (Schilthorn) | Replacement ropeway | Garaventa | In construction | |
15-KBK Weglosen-Sebli Oberiberg (Hoch-Ybrig) | Replacement ropeway | Garaventa | In construction | |
10-KBK Schifer-Weissfluhjoch Davos (Parsenn) | Replacement ropeway | Garaventa | Realization probable | |
10-KBK Verbier-Planards Verbier (Les 4 Vallées) | Replacement ropeway | Garaventa | Realization probable | |
6-SBK / 10-KBK Planards-Savoleyres Verbier (Les 4 Vallées) | Replacement ropeway | Garaventa | Realization probable | |
6-SBK/B Lac des Vaux-Col de Chassoure Verbier (Les 4 Vallées) | Replacement ropeway | Bartholet | Realization probable | |
10-KBK Adelboden-Sillerenbühl Adelboden (Hahnenmoos) | Replacement ropeway | Garaventa | Realization uncertain | |
10-KBK Fiesch-Bellwald Bellwald | New ropeway | Realization uncertain | ||
8-KBK Lana-La Meina Evolène (La Meina) | Replacement ropeway | Realization uncertain | ||
8-LPB Intragna-Pila-Costa Intragna | Replacement ropeway | Inauen-Schätti | Realization uncertain | |
8-LPB Verdasio-Rasa Intragna | Replacement ropeway | Inauen-Schätti | Realization uncertain | |
8-KBK Les Diablerets-Isenau Les Diablerets (Isenau) | Replacement ropeway | Garaventa | Realization uncertain | |
8-KBK Rivera-Piano di Mora Rivera (Monte Tamaro) | Replacement ropeway | Bartholet | Realization uncertain | |
8-KBK Piano di Mora-Alpe Foppa Rivera (Monte Tamaro) | Replacement ropeway | Bartholet | Realization uncertain | |
10-KBK Laret-Muller Samnaun | New ropeway | Garaventa | Realization uncertain | |
10-KBK St. Moritz Bad-Signal St. Moritz (Corviglia) | Replacement ropeway | Realization uncertain | ||
8-KBK Tschierv-Alp da Munt Tschierv (Minschuns) | New ropeway | Bartholet | Realization uncertain | |
6-SBK/B Höllwies Oberstdorf (Söllereck) | Replacement ropeway | Previous installation | Realization uncertain | |
6-SBK/B Wannenköpfle Oberstdorf (Söllereck) | Replacement ropeway | Previous installation | Leitner | Realization uncertain |
Legend
- Completed: The construction of the installation is completed and the ropeway is in operation.
- In construction: The installation is in the construction phase.
- Realization definitive: The realization of the project is secured and the construction will start soon.
- Realization probable: The realization of the project is officially confirmed and it is expected that objections, financing and other conditions for construction will be resolved shortly.
- Realization uncertain: The realization of the project is officially planned. However, due to objections, financing problems, changed plans or other reasons, the construction may be delayed for some time or the project may be abandoned.