Ropeway Database - Projects

The following table provides an overview of projected ropeway installations in Germany and Switzerland for the next two years. The projects are listed in ascending order by year of construction and status. Where available, the current installation to be replaced by the planned new construction is also indicated.

The list is updated at irregular intervals. The information has been researched and prepared to the best of our knowledge. However, we cannot guarantee the accuracy of the data. Experience has shown that there are always changes in the planned implementation of projects at short notice.

ProjectManufacturerStatus
2024
85-LPB Stechelberg-Mürren
Mürren (Schilthorn)
GaraventaIn construction
10-KBK Saas Fee-Hannig
Saas Fee
In construction
10-KBK Ochsenkopf Süd
Warmensteinach (Ochsenkopf)
In construction
10-KBK Startgels-Segnes
Flims (Flims-Laax-Falera)
BartholetRealization definitive
10-KBK Segnes-Nagens
Flims (Flims-Laax-Falera)
BartholetRealization definitive
4-SBK/B Rungg-Stätzertäli
Lenzerheide (Lenzerheide-Arosa)
LeitnerRealization definitive
8-KBK Les Marécottes-La Creusaz
Les Marécottes
GaraventaRealization definitive
80-LPB Stand-Kleintitlis 2
Engelberg (Titlis)
SteurerRealization probable
10-KBK Segnes-Ils Cugns
Flims (Flims-Laax-Falera)
BartholetRealization probable
6-SBK / 10-KBK Prarion-Tracouet
Nendaz (Les 4 Vallées)
GaraventaRealization probable
8-LPB Intragna-Pila-Costa
Intragna
Inauen-SchättiRealization uncertain
8-LPB Verdasio-Rasa
Intragna
Inauen-SchättiRealization uncertain
10-KBK Laret-Muller
Samnaun
GaraventaRealization uncertain
6-SBK/B Höllwies
Oberstdorf (Söllereck)
Realization uncertain
6-SBK/B Wannenköpfle
Oberstdorf (Söllereck)
LeitnerRealization uncertain
2025
100-LPB Mürren-Birg
Mürren (Schilthorn)
GaraventaIn construction
15-KBK Weglosen-Sebli
Oberiberg (Hoch-Ybrig)
GaraventaIn construction
10-KBK Schifer-Weissfluhjoch
Davos (Parsenn)
GaraventaRealization probable
10-KBK Verbier-Planards
Verbier (Les 4 Vallées)
GaraventaRealization probable
6-SBK / 10-KBK Planards-Savoleyres
Verbier (Les 4 Vallées)
GaraventaRealization probable
6-SBK/B Lac des Vaux-Col de Chassoure
Verbier (Les 4 Vallées)
BartholetRealization probable
10-KBK Adelboden-Sillerenbühl
Adelboden (Hahnenmoos)
GaraventaRealization uncertain
10-KBK Fiesch-Bellwald
Bellwald
Realization uncertain
8-KBK Lana-La Meina
Evolène (La Meina)
Realization uncertain
8-KBK Les Diablerets-Isenau
Les Diablerets (Isenau)
GaraventaRealization uncertain
8-KBK Rivera-Piano di Mora
Rivera (Monte Tamaro)
BartholetRealization uncertain
8-KBK Piano di Mora-Alpe Foppa
Rivera (Monte Tamaro)
BartholetRealization uncertain
10-KBK St. Moritz Bad-Signal
St. Moritz (Corviglia)
Realization uncertain
8-KBK Tschierv-Alp da Munt
Tschierv (Minschuns)
BartholetRealization uncertain

Legend

  • Completed: The construction of the installation is completed and the ropeway is in operation.
  • In construction: The installation is in the construction phase.
  • Realization definitive: The realization of the project is secured and the construction will start soon.
  • Realization probable: The realization of the project is officially confirmed and it is expected that objections, financing and other conditions for construction will be resolved shortly.
  • Realization uncertain: The realization of the project is officially planned. However, due to objections, financing problems, changed plans or other reasons, the construction may be delayed for some time or the project may be abandoned.