Ropeway Database - Projects

The following table provides an overview of projected ropeway installations in Germany and Switzerland for the next two years. The projects are listed in ascending order by year of construction and status. Where available, the current installation to be replaced by the planned new construction is also indicated.

The list is updated at irregular intervals. The information has been researched and prepared to the best of our knowledge. However, we cannot guarantee the accuracy of the data. Experience has shown that there are always changes in the planned implementation of projects at short notice.

ProjectManufacturerStatus
2025
10-KBK Les Grillesses-Le Bâté
Anzère (Pas de Maimbré)
GaraventaCompleted
4-SBK/B Meierhofertälli-Wasserscheide
Davos (Parsenn)
GaraventaCompleted
80-LPB Stand-Kleintitlis 2
Engelberg (Titlis)
SteurerCompleted
10-KBK Segnes-Ils Cugns
Flims (Flims-Laax-Falera)
BartholetCompleted
37-LPB Elsigbach-Elsigenalp
Frutigen (Elsigenalp)
GaraventaCompleted
8-LPB Furen-Trift
Grimsel
SteurerCompleted
35-LPB Grindelwald-Pfingstegg
Grindelwald (Pfingstegg)
GaraventaCompleted
8-KBK Fuorcla-Crap Masegn
Laax (Flims-Laax-Falera)
GaraventaCompleted
8-KBK Fuorcla-Vorabgletscher
Laax (Flims-Laax-Falera)
GaraventaCompleted
100-LPB Mürren-Birg 2
Mürren (Schilthorn)
GaraventaCompleted
100-LPB Birg-Schilthorn 1
Mürren (Schilthorn)
GaraventaCompleted
2-SBF Mayens de Nax-Gautier
Nax
BartholetCompleted
15-KBK Weglosen-Seebli
Oberiberg (Hoch-Ybrig)
GaraventaCompleted
8-LPB Rodi-Tremorgio
Prato
BartholetCompleted
8-KBK Rivera-Piano di Mora-Alpe Foppa
Rivera (Monte Tamaro)
BartholetCompleted
6-SBK Val Val-Cuolm Val
Sedrun (Oberalp)
GaraventaCompleted
6-SBK Val Val-Calmut
Sedrun (Oberalp)
GaraventaCompleted
6-SBK/B Randolins-Munt da San Murezzan
St. Moritz (Corviglia)
LeitnerCompleted
8-LPB Champsec-Sarreyer
Val de Bagnes
Von Rotz & WiedemarCompleted
6-SBK Lac des Vaux-Col de Chassoure
Verbier (Les 4 Vallées)
BartholetCompleted
6-SBK / 10-KBK Planards-Savoleyres
Verbier (Les 4 Vallées)
GaraventaCompleted
8-SBK/B Riffelberg-Gifthittli
Zermatt
LeitnerCompleted
8-SBK/B Hausberg-Kreuzwankl
Garmisch-Partenkirchen
DoppelmayrCompleted
4-SBF Kleiner Almberg
Mitterfirmiansreut (Mitterdorf)
LeitnerCompleted
6-SBK/B Großer Almberg
Mitterfirmiansreut (Mitterdorf)
LeitnerCompleted
2-SLE Höllwies
Oberstdorf (Söllereck)
DoppelmayrCompleted
6-SKB/B Silbersattel
Steinach
DoppelmayrCompleted
2026
8-LPB Fidaz-Flimserstein
Fidaz
In construction
100-LPB Birg-Schilthorn 2
Mürren (Schilthorn)
GaraventaIn construction
85-LPB Schwägalp-Säntis
Säntis
GaraventaIn construction
10-KBK Verbier-Planards
Verbier (Les 4 Vallées)
GaraventaIn construction
6-SBK/B Pissevache-Grand Tsai
Bruson (Les 4 Vallées)
BartholetRealization probable
10-KBK Schifer-Weissfluhjoch
Davos (Parsenn)
GaraventaRealization probable
10-KBK Adelboden-Sillerenbühl
Adelboden (Hahnenmoos)
GaraventaRealization uncertain
10-KBK Innerarosa-Hörnli
Arosa (Lenzerheide-Arosa)
GaraventaRealization uncertain
8-SBK/B Schönboden-Hörnli
Arosa (Lenzerheide-Arosa)
GaraventaRealization uncertain
10-KBK Fiesch-Bellwald
Bellwald
Realization uncertain
4-SBK Puozas-Parlets
Disentis
GaraventaRealization uncertain
8-KBK Lana-La Meina
Evolène (La Meina)
Realization uncertain
80-LPB Fiescheralp-Eggishorn
Fiescheralp (Aletschregion)
GaraventaRealization uncertain
8-LPB Verdasio-Rasa
Intragna
Inauen-SchättiRealization uncertain
8-KBK Les Diablerets-Isenau
Les Diablerets (Isenau)
GaraventaRealization uncertain
10-KBK Laret-Muller
Samnaun
GaraventaRealization uncertain
10-KBK St. Moritz Bad-Signal
St. Moritz (Corviglia)
Realization uncertain

Legend

  • Completed: The construction of the installation is completed and the ropeway is in operation.
  • In construction: The installation is in the construction phase.
  • Realization definitive: The realization of the project is secured and the construction will start soon.
  • Realization probable: The realization of the project is officially confirmed and it is expected that objections, financing and other conditions for construction will be resolved shortly.
  • Realization uncertain: The realization of the project is officially planned. However, due to objections, financing problems, changed plans or other reasons, the construction may be delayed for some time or the project may be abandoned.