Surface lift Alp Dado-Fil da Rubi in Waltensburg
2-person Surface lift Alp Dado-Fil da Rubi
AI Abstract
The Alp Dado-Fil da Rubi cable car, a 2-person Surface lift model located in Waltensburg (Grisons), was built in 1975 and connected the valley station at 1850 m with the mountain station at 2418 m above sea level. The length was 2103 meters, and the elevation difference was 568 meters. The system was designed by the manufacturer Städeli and was decommissioned in 2008 and replaced by a successor.
| Country |
|
|---|---|
| Canton / State |
|
| Location | Waltensburg (Brigels-Waltensburg) |
| Name | Alp Dado-Fil da Rubi |
| Type | 2-SLE (SUMF-E2) |
| Operating Time | 1975 - 2008 |
| Manufacturer | Städeli |
| Status |
|
- Country: Switzerland
- Canton / State: Grisons
- Location: Waltensburg (Brigels-Waltensburg)
- Name: Alp Dado-Fil da Rubi
- Type: 2-SLE
- Operating Time: 1975-2008
- Year of construction: 1975
- Manufacturer: Städeli
- Status: Dismantled with replacement
- Bottom station altitude: 1850 m
- Difference in altitude: 568 m
- Length: 2103 m
- Capacity: 900 P/h
- Travel time: 9 min
- Speed: 3,8 m/s
- Number of towers: 18
- Number of carriers: 160
- Drive terminal: Bottom station
- Tensioning terminal: Bottom station
- Carrier manufacturer: Borer, Städeli
- Transportation uphill: Yes
- Transportation downhill: No
Frequently asked questions
What is the ropeway Alp Dado-Fil da Rubi?
The Alp Dado-Fil da Rubi ropeway is a 2-person Surface lift in Waltensburg and connects the valley station at 1850 m to the mountain station at 2418 m.
What is the hourly passenger capacity of the Alp Dado-Fil da Rubi ropeway?
The maximum capacity of the Alp Dado-Fil da Rubi ropeway is 900 people per hour.
When was the Alp Dado-Fil da Rubi ropeway constructed?
The Alp Dado-Fil da Rubi ropeway was constructed in 1975.
Where is the Alp Dado-Fil da Rubi ropeway located?
The Alp Dado-Fil da Rubi ropeway is operating in Waltensburg (Switzerland).
How long is the Alp Dado-Fil da Rubi ropeway?
The diagonal length of the Alp Dado-Fil da Rubi ropeway is 2103 meters.
What is the elevation gain of the Alp Dado-Fil da Rubi ropeway?
The Alp Dado-Fil da Rubi ropeway covers an elevation gain of 568 meters.
Who is the manufacturer of the Alp Dado-Fil da Rubi ropeway?
The Alp Dado-Fil da Rubi ropeway was constructed by the company Städeli.
Technical data
| Bottom station altitude | 1850 | m |
|---|---|---|
| Top station altitude | 2418 | m |
| Difference in altitude | 568 | m |
| Length | 2103 | m |
| Capacity | 900 | P/h |
| Travel time | 9 | min |
| Speed | 3,8 | m/s |
| Number of towers | 18 | |
| Number of carriers | 160 | |
| Drive terminal | Bottom station | |
| Tensioning terminal | Bottom station | |
| Carrier manufacturer | Borer, Städeli | |
| Rope manufacturer | ||
| Electronics manufacturer | ||
| Transportation uphill | Yes | |
| Transportation downhill | No | |
| Remarks | None | |
Chronicle
-
-
-
Photos of this ropeway
Videos of this ropeway
Location of the installation
Coordinates (decimal): Bottom station 46.79303 N / 9.08045 E, Top station 46.80522 N / 9.0606 E
Location of the installation: Google Maps • Swisstopo • Swisstopo (historisch)
Map legend:
Ropeway in operation
Ropeway out of operation
Ropeway dismantled
About
Bergbahnen.org is the German-speaking internet platform on the subject of ropeways from enthusiasts for enthusiasts, with a geographical focus on Germany and Switzerland.
A unique ropeway database, exciting information on technology and history as well as thousands of photos, videos and documentaries of ropeways from all over the world are waiting to be discovered!
Categories
Ropeway Database
Technology & History
Multimedia
Store
Community





