Ropeway Database - 1-SLG / 1-SBK Gründji-Hörnli (Arosa)
1-SLG / 1-SBK Gründji-Hörnli
Last update: 17.03.2017 15:38 (Updated by Felix)
Technical data
| Bottom station altitude | 1834 | m |
| Top station altitude | 2497 | m |
| Difference in altitude | 663 | m |
| Length | 2710 | m |
| Capacity | 350 | P/h |
| Travel time | 23 | min |
| Speed | 3 / 2 | m/s |
| Number of towers | 51 | |
| Number of carriers | 250 / 85 | |
| Drive terminal | ||
| Tensioning terminal | Bottom station | |
| Carrier manufacturer | Oehler | |
| Rope manufacturer | ||
| Electronics manufacturer | ||
| Transportation uphill | Yes | |
| Transportation downhill | ||
| Remarks | Gleichzeitiger Betrieb von Skilift und Sesselbahn möglich. Bau Skilift 1945, Umbau für kombinierten Betrieb mit Sesselbahn 1948. | |
Chronicle
The installation replaces the following ropeway(s)
-
-
The installation was previously located in the following place
-
-
1-SLG / 1-SBK Gründji-Hörnli
After dismantling, the installation was set up again at the following location
-
-
The installation was replaced by the following ropeway(s)
Photos of this ropeway
Currently there are no photos of this ropeway available in the gallery.
Videos of this ropeway
Currently, there are no videos of this ropeway available.
Location of the installation
Coordinates (decimal): Bottom station 46.77095 N / 9.65374 E, Top station 46.76646 N / 9.62091 E
Location of the installation: Google Maps • Swisstopo • Swisstopo (historisch)
Please enable marketing cookies to view this content.
Map legend:
Ropeway in operation
Ropeway out of operation
Ropeway dismantled


















