Ropeway Database - 6-SBK Les Bochasses (Morgins)
6-SBK Les Bochasses
Last update: 11.02.2022 11:54 (Updated by IfPP TU Dortmund)
Photo provided by: Königsspitze
Technical data
| Bottom station altitude | 1499 | m |
| Top station altitude | 1883 | m |
| Difference in altitude | 384 | m |
| Length | 1667 | m |
| Capacity | 2400 | P/h |
| Travel time | 6 | min |
| Speed | 5 | m/s |
| Number of towers | 14 | |
| Number of carriers | 79 | |
| Drive terminal | ||
| Tensioning terminal | ||
| Carrier manufacturer | Garaventa | |
| Rope manufacturer | Fatzer | |
| Electronics manufacturer | Sisag | |
| Transportation uphill | Yes | |
| Transportation downhill | No | |
| Remarks | None | |
Chronicle
The installation replaces the following ropeway(s)
The installation was previously located in the following place
-
-
6-SBK Les Bochasses
After dismantling, the installation was set up again at the following location
-
-
The installation was replaced by the following ropeway(s)
-
-
Photos of this ropeway
Videos of this ropeway
Currently, there are no videos of this ropeway available.
Location of the installation
Coordinates (decimal): Bottom station 46.21818 N / 6.87199 E, Top station 46.21702 N / 6.85088 E
Location of the installation: Google Maps • Swisstopo
Please enable marketing cookies to view this content.
Map legend:
Ropeway in operation
Ropeway out of operation
Ropeway dismantled




















